MA 2 shield, from wikimedia MA 2 Exit List

58 Miles of Freeway, From I-91 in Greenfield to US 3/MA 16 in Cambridge

Exit Renumbering Completed April 13, 2021

Image of 1 mile advance sign for MA 27 exit with new milepost based exit number and yellow Old Exit 42 advisory sign on support on MA 2 East in Acton, May 2021

Interchange

Milepost

New Exit Number

Old Exit Number

 W. River St - Orange Center

66.6

67

14

 MA 122 shield, from wikimedia - Orange, Worcester

69.8

70

15

 US 202 shield, from wikimedia South - Belchertown

70.7

71

16

 MA 32 shield, from wikimedia - Athol, Petersham

75.2

75

17

 MA 2A shield, from wikimedia - Athol, Phillipston

76.5

77

18

 US 202 shield, from wikimedia North MA 2A shield image from wikimedia - Phillipston, Winchendon

79.0

79

19

 Baldwinville Rd - Templeton, Baldwinville

81.9

82

20

 MA 2A shield, from wikimedia MA 101 shield, from wikimedia - E. Templeton, Ashburnham

83.5

83

21

 MA 68 shield, from wikimediai - Gardner, Hubbardston

86.5

86

22

 Pearson Blvd - S. Gardner

87.3

87

23

 W. Main St - Winchendon

89.7

90A (90 EB)

24A (24 EB)

 MA 140 shield, from wikimedia North - Ashburnham (WB)

89.7

90B

24B

 MA 2A shield, from wikimedia MA 140 shield, from wikimedia South - Fitchburg, Princeton

91.8

92

25

 Willard Rd / Village Inn Rd (EB)

92.6

93 (93A)*

26

 Narrows Rd / Depot Rd

93.5

94 (93B/93 WB)*

27

 MA 31 shield, from wikimedia - Fitchburg, Princeton

94.5

95

28

 Mt Elam Rd

96.3

96

29

 Merriam Ave / South St - Leominster, Fitchburg

98.0

98

30

 MA 12 shield, from wikimedia South - Leominster

99.3

99A (99 EB)

31A (31 EB)

 MA 12 shield image from wikimedia North - Fitchburg (WB)

99.3

99B

31B

 MA 13 shield, from wikimedia - Leominster, Lunenburg

100.4

100

32

 I-190 shield, from wikimedia South - Leominster, Worcester

101.1

101

33

 Mechanic St / Harvard St

102.4

102

34

 MA 70 shield, from wikimedia South - Lancaster, Lunenburg

103.5

103

35

 Shirley Rd - Shirley

104.9

105

36

 Fort Devens (no Public Access) (WB)

106.4

106A (106 EB)

37A (37 EB)

 Jackson Rd - Devens Reserve Force TA

106.3

106B

37B

 MA 110 shield, from mediawiki MA 111 shield, from wikimedia South - Harvard, Worcester

109.3

109A

38A

 MA 110 shield, from mediawiki MA 111 shield, from wikimedia North - Ayer, Groton

109.3

109B

38B

 Taylor St - Littleton, Boxboro

113.1

112 (113A)*

39

 I-495 shield, from wikimedia South - Marlboro, Cape Cod

113.3

113A (113B)*

40A

 I-495 shield, from wikimedia North - Lowell, Lawrence

113.3

113B (113C)*

40B

 Newtown Rd / Central St - West Acton, Littleton

115.5

115

41

 MA 27 shield, from wikimedia - Acton, Maynard

117.6

117 (118A)*

42

 MA 111 shield, from wikimedia North - West Acton (WB)

118.0

118 (118B)*

43

Freeway Ends, Does not resume until Mile 128

 MA 2A shield image from wikimedia East - Lexington

124.8

125

50

Resume Freeway

 I-95 shield from mediawiki (MA 128 shield, from wikimedia) South - Attleboro

128.5

127A (128A)*

52A

 I-95 shield from mediawiki (MA 128 shield, from wikimedia) North - Peabody

128.5

127B (128B)*

52B

 Spring St - Lexington, Waltham (EB)

129.0

128 (129)*

53

 Waltham St - Lexington (WB)

130.0

129A (130A)*

54A

 Waltham St - Waltham (WB)

130.0

129B (130B)*

54B

 Pleasant St - Lexington, Waltham (EB)

130.9

130 (131A)*

55

 MA 4 shield, from wikimedia North MA 225 shield, from wikimedia West - Lexington, Bedford

131.4

131 (131B/131 WB)**

56

 Dow Ave - Arlington, Belmont

132.0

132

57

 Park Ave - Belmont, Arlington Heights

132.7

133

58

 MA 60 shield, from wikimedia - Arlington Center, Belmont Center

133.7

134 (134A)*

59

 Lake St - E. Arlington, Belmont

134.1

135 (134B)*

60

Expressway Ends at  US 3 shield, from wikimedia and MA 16 shield, from wikimedia, Alewife Brook Parkway

134.9

--

--

This exit list contains both the new exit number and old sequential exit number after MassDOT started converted Route 2 to the Geographic Reference or Milepost Exit Numbering system on the morning of April 13, 2021. MassDOT started converting exit numbers starting in October 2020 with the routes in eastern and southern parts of the state. This project was first planned for 2016, but eventually postponed.

*Numbers in ( ) listed for the postponed 2016 Renumbering Project.

© Robert H. Malme 2014-2021